Monday, March 26, 2012

Progress!!!

There has been some progress, Hubby tore up all the tile, pulled all the old moldy insulation out of the wall surrounding the shower and tub area. He scrubbed down the walls with a mold killer solution.
Below he is framing in the new shower stall, we have decide to use a shower base instead of building our own and having to tile it.


















This is a picture of the tub area where the free standing tub will be. That's the drain pipe sticking out of the floor in the center of the picture. Shower base is off to the right in the picture. Next up is adding new instillation and vapor barrier/tuck tape and then drywalling. Hubby is happy that there will be no real taping or sanding as we have decided to use wainscoting around the room as a decorative finish.