Below he is framing in the new shower stall, we have decide to use a shower base instead of building our own and having to tile it.
This is a picture of the tub area where the free standing tub will be. That's the drain pipe sticking out of the floor in the center of the picture. Shower base is off to the right in the picture. Next up is adding new instillation and vapor barrier/tuck tape and then drywalling. Hubby is happy that there will be no real taping or sanding as we have decided to use wainscoting around the room as a decorative finish.