So the 'guys' cut back all the grass in the shape of the patio we wanted....
Built the forms and filled in with gravel.....Smothed out the top coat of gravel and sprayed to 'wet' down
A Renovation of a Boundray Park Home
Friday, April 13, 2012
The work begins....
Detour...
As the title says there has been a slight detour with the master bath renovation.... Go figure.
The hubby got a free hot tub two weekends ago and we had really no place to put it. Back yard 'renovations' are not on the 2012 list. We were going to look at doing it spring of 2013. Well with the free hot tub we had to figure something now. Bring on the quotes for a concrete patio.....
Who would have thought pricing could be so different. We did our do diligence and got two quotes, wholly difference in price!
Let me paint you a picture....See the crack circled in red...well that our front side walk sliding/breaking away from the front step. I am pretty sure the previous owners TRIED to patch it but it never worked.
So the hubby and I decided to add the repairing of this to the over all project of getting a patio poured in the back yard. Bring on the quotes..... The first company quoted us almost $6000 to do the whole project. The second company quoted us $4500 we were both shocked!! Huge difference, now if it had been something minor like a couple hundred not a big deal. But a $1500 price difference was just to big a difference. So we called up as many people would could think that had done ANY kind of concrete work and asked their opinion. We had the cheaper of the two come out and explain exactly what he was going to do.
In the end we went with the cheaper of the two.
The hubby got a free hot tub two weekends ago and we had really no place to put it. Back yard 'renovations' are not on the 2012 list. We were going to look at doing it spring of 2013. Well with the free hot tub we had to figure something now. Bring on the quotes for a concrete patio.....
Who would have thought pricing could be so different. We did our do diligence and got two quotes, wholly difference in price!
Let me paint you a picture....See the crack circled in red...well that our front side walk sliding/breaking away from the front step. I am pretty sure the previous owners TRIED to patch it but it never worked.
So the hubby and I decided to add the repairing of this to the over all project of getting a patio poured in the back yard. Bring on the quotes..... The first company quoted us almost $6000 to do the whole project. The second company quoted us $4500 we were both shocked!! Huge difference, now if it had been something minor like a couple hundred not a big deal. But a $1500 price difference was just to big a difference. So we called up as many people would could think that had done ANY kind of concrete work and asked their opinion. We had the cheaper of the two come out and explain exactly what he was going to do.
In the end we went with the cheaper of the two.
Monday, March 26, 2012
Progress!!!
There has been some progress, Hubby tore up all the tile, pulled all the old moldy insulation out of the wall surrounding the shower and tub area. He scrubbed down the walls with a mold killer solution.
Below he is framing in the new shower stall, we have decide to use a shower base instead of building our own and having to tile it.
This is a picture of the tub area where the free standing tub will be. That's the drain pipe sticking out of the floor in the center of the picture. Shower base is off to the right in the picture. Next up is adding new instillation and vapor barrier/tuck tape and then drywalling. Hubby is happy that there will be no real taping or sanding as we have decided to use wainscoting around the room as a decorative finish.
Below he is framing in the new shower stall, we have decide to use a shower base instead of building our own and having to tile it.
This is a picture of the tub area where the free standing tub will be. That's the drain pipe sticking out of the floor in the center of the picture. Shower base is off to the right in the picture. Next up is adding new instillation and vapor barrier/tuck tape and then drywalling. Hubby is happy that there will be no real taping or sanding as we have decided to use wainscoting around the room as a decorative finish.
Demo!
Tuesday, February 14, 2012
Valentine's Day...
Good Morning and Happy Valentine's Day
<-----For the husband
I was a busy girl last night as I made my two gifts to give....
<-----For the husband
<------ For the daughter
Thursday, February 9, 2012
Back at it.....
We're finally going to work on the master suite... I have big plans for this space. We haven't been living in the space (its been a catch all for all things bathroom related) Lets take a look at the before.....
Subscribe to:
Posts (Atom)